image

Stokely home 
Search 
Sitemap 
About Stokely 

The Lighter Side of Sysadm | Ranting & Raving | Pete's Back Yard

______________

Bill Gates Hears From His Housing Contractor

Author Unknown

While the Bill Gates family is moving in from their temporary quarters nearby, final construction of their new house is not expected to be completed until the end of the year. We listen in on a discussion Mr. Gates is having with his housing Contractor...

Bill: "There are a few issues we need to discuss."

Contractor: "Ah, you have our basic support option. Calls are free for the first 90 days and $75 a call thereafter. Okay?"

Bill: "Uh, yeah... the first issue is the living room. We think its a little smaller than we anticipated."

Contractor: "Yeah. Some compromises were made to have it out by the release date."

Bill: "We won't be able to fit all our furniture in there."

Contractor: "Well, you have two options. You can purchase a new, larger living room or you can use a Stacker."

Bill: "Stacker?"

Contractor: "Yeah, it allows you to fit twice as much furniture into the room. By stacking it, of course, you put the entertainment center on the couch... the chairs on the table... etc. You leave an empty spot, so when you want to use some furniture you can unstack what you need and then put it back when you're done."

Bill: "Uh... I dunno... issue two. The second issue is the light fixtures. The bulbs we brought with us from our old home won't fit. The threads run the wrong way."

Contractor: "Oh! That's easy. Those bulbs aren't plug and play. You'll have to upgrade to the new bulbs."

Bill: "And the electrical outlets? The holes are round, not rectangular. How do I fix that?"

Contractor: "Just uninstall and reinstall the electrical system."

Bill: "You're kidding!?"

Contractor: "Nope. Its the only way."

Bill: "sigh) Well... I have one last problem. Sometimes, when I have guests over, someone will flush the toilet and it won't stop. The water pressure drops so low that the showers dont work."

Contractor: "That's a resource leakage problem. One fixture is failing to terminate and is hogging the resources preventing access from other fixtures."

Bill: "And how do I fix that?"

Contractor: "Well, after each flush, you all need to exit the house, turn off the water at the street, turn it back on, reenter the house and then you can get back to work."

Bill: "That's the last straw. What kind of product are you selling me?"

Contractor: "Hey, if you don't like it nobody made you buy it."

Bill: "And when will this be fixed?"

Contractor: "Oh, in your next house -- which will be ready to release sometime near the end of next year. Actually it was due out this year, but we've had some delays..."

______________

Stokely Consulting, http://www.stokely.com
Email: Celeste Stokely | Peter Stokely
163 14th Trail, Unit B, Cotopaxi CO 81223, (719) 942-3621
Copyright © 2013 Stokely Consulting. All rights reserved.

Enough is enough. Vote Libertarian if you believe in individual liberty and personal responsibility, a free-market economy, and a foreign policy of non-intervention, peace, and free trade.